Flexible and future proof.
New data center campus 20 km outside the Norwegian capital, Oslo.
Space
Power Capacity
Grid supplies
OSL-Enebakk is our newest data center site located in Enebakk, just 20 km outside Oslo, the capital of Norway. Green Mountain has acquired a 75 000 m2 (800 000 ft2) area with line-of-sight capacity of 93 MW. The construction of the first 4 MW building was completed in October 2020, with further expansions in 2022 and 2023. The building is dedicated to a single client. In December 2022, a new 13,5 MW colocation building was completed at the campus. In 2024, a third 10 MW building will be completed.
An international client currently occupies the first data center building, whereas the second and third buildings are for multi-tenancy. In summary, the site is perfectly situated in terms of power supply, infrastructure, and connectivity close to Norway’s most populated area.
Features
- Build Year: 2020 3 buildings 75 000 m2 space available One single-tenant building and two multi-tenant buildings. Flexible design which can be scaled up or down based on our clients’ requirements. Current fill rate: 65%
- Maximum Capacity: 93 MW 2 independent grid supplies each fed from multiple hydropower plants. 100% renewable hydropower Average PUE: 1.20 Automatic standby generators N+1 chiller solution designed for precision System prepared for heat reuse through heat exchangers
- Security personnel 24/7 onsite security personnel Remote monitoring 24/7 Biometric access systems, man traps and intelligent video surveillance. High boundary fencing around the whole area.
- Carrier neutral data center – 3 independent fiber providers available. Office space for clients. Smart hands services.
Flexible and scalable data center site
The location is ideal for clients with specific requirements for growth. They can start with a limited footprint in a colocation center to support proof-of-concept or operational concepts. Furthermore, we can support any avenue through to individual buildings or modules with no limit in regards to power capacity. We offer rapid deployment of new modules, and solutions can be designed and delivered to support “any” power density, cooling, security solutions etc.
Power supplies
The new data center site has two independent power grid suppliers and is located in the vicinity of several hydropower plants. Therefore, we have access to enough power to secure the necessary capacity to develop the campus for the future while securing resilience and redundancy. In addition, Norway is the #1 producer of sustainable hydropower in Europe. This gives us reliable access to 100% renewable energy from a robust power grid. Moreover, Green Mountain also uses the Norwegian wet and cool climate to our advantage.
Connectivity
Green Mountain’s OSL-Enebakk data center site in an area with several connectivity providers already present. Due to the increased need for fiber at the site, additional new capacity is being planned and built in the area. As a result, this makes the data center site one of the most connected campuses in the region.